Joe C Bean High School – Everman ISD

Includes 3 new ground up additions and two exterior courtyard renovations & additions.

A single connecting corridor was installed between the existing Davis 9th Grade Center and Joe C Bean HS building just North of the new Library that was built in 2016.  This section is a replica of the exterior window wall of the library and cafeteria corridor enclosing a new courtyard for student use during lunch hours.

The 2-story addition includes new classrooms, office space, entrance point from South part of Campus, New Science Labs, Robotics and Computer Labs.  This is the first 2 Story addition to this campus and included a new elevator.

The last addition is a single-story dance hall and weight room.  It was installed on the East side of Campus next to the new gym and band hall that SEDALCO constructed in 2016.

LOCATION

Everman, TX

SF

60,000

Architect

Huckabee & Associates